Jiangmen hardware accessories factory analyzes its mold processing process arrangement

2019-12-29 1349

  Mold making refers to the processing of forming and blank making tools, in addition to shear mold and die-cutting mold. Generally, the mold has two parts: upper mold and lower mold. The steel plate is placed between the upper and lower dies to realize the material forming under the action of the press. When the press is opened, the workpiece determined by the die shape will be obtained or the corresponding waste materials will be removed. As small as electronic connector, as large as the automobile dashboard, the workpiece can be molded with mold. Progressive die refers to a set of die which can automatically move the workpiece from one station to another and get the forming parts at the last station. Die processing technology includes: cutting die, blanking die, compound die, extrusion die, four slide die, progressive die, stamping die, die cutting die, etc.

  Process flow arrangement

  1. Bottom surface processing, processing quantity guarantee;

  2. Casting blank datum alignment, 2D and 3D mold surface allowance inspection;

  3. Rough machining of 2D and 3D profile, non installation non working plane (including safety platform surface, buffer installation surface, pressing plate plane and side datum plane);

  4. Before semi finishing, the side datum should be aligned correctly to ensure the accuracy;

  5. Semi finish machining of 2D and 3D profile, finish machining of all kinds of installation working surfaces (including limit block installation surface and contact surface, insert installation surface and back side, punch installation surface, waste cutter installation surface and back side, spring installation surface and contact surface, all kinds of travel limit working surface, wedge installation surface and back side), semi finish machining of all kinds of guide surfaces and guide holes, leaving allowance for finish machining process Datum hole and height datum, and record data;

  6. Check and recheck the machining accuracy;

  7. Fitter setting process;

  8. Before finishing, align the reference surface of the process reference hole and check the allowance of the insert;

  9. Finish machining profile 2D, 3D, side punching profile and hole position, finish machining process reference hole and height reference, finish machining guide surface and guide hole;

  10. Check and recheck the machining accuracy.

  Jiangmen hardware accessories factory http://www.npidev.com//


国产精品高潮呻吟久久AV无码| 欧美浓毛大泬视频| 亚洲色图片区| 国产裸拍裸体视频在线观看 | 成人欧美一区二区三区| 亚洲欧美国产国产一区二区三区| 国产女主播高潮在线播放| 无码人妻精品一区二区三区不卡| 精品日本一区二区三区在线观看| 亚洲AV无码国产丝袜在线观看| 国产高清一区二区三区视频| 亚洲成a人片在线观看无码专区| 精品日产一卡2卡三卡4卡自拍 | 狠狠97人人婷婷五月| 人人妻人人澡AV天堂香蕉| 无码熟妇人妻av在线网站| 四虎影视在线影院在线观看 | 亚洲成a人片在线观看无码3d| 无码无套少妇毛多69xxx| 日本久久久WWW成人免费毛片丨| 国产精品成人无码免费| 欧美亚洲国产片在线播放 | 久久香蕉国产线看观看精品yw| 无码天堂亚洲国产av| 国产在aj精品| 无码午夜人妻一区二区三区不卡视频| 99久久精品国产一区二区三区 | 日产无人区一线二线三线乱码蘑菇| 国精产品一区一区三区有限| 99在线精品国自产拍中文字幕| 色久综合网精品一区二区| 18禁在线永久免费观看| 国产免费拔擦拔擦8x高清在线人| 亚洲午夜精品一区二区| 男女18禁啪啪无遮挡激烈| 少妇久久久久久久久久| 国产人妖视频一区二区| 在线天堂资源www在线中文| 成 人免费va视频| 妈妈醉酒后误认为我是爸爸| 国产精品午夜无码AV体验区 |